2109-0051-REN

Permit

Remodel / Repair

Type

3203 32 Ave S

Location

Overview

A listing of the key features of the permit. To print this information, use the button below.

Printer Friendly Version

Description

Interior renovation of an existing bank.

Details
Name Value
Project Costs 1204000.00
1st Floor Area (ft²) 4142.00
2nd Floor Area (ft²) 8438.00
3rd Floor and Above Area (ft²)
Basement Area Finished (ft²)
Total Construction Area (ft²) 12580.00
Electrical Work Yes - by Contractor
Gas Piping Work
Heating or Air Conditioning Work Yes - by Contractor
Plumbing Work Yes - by Contractor
Dwelling Units (DU) Added
Detailed Use
Establishment Name Border Bank
Occupant Load 83
Contact Name Tom Jarvis
Contact Type General Contractor
Business Associated With Border Construction
Contact Phone Number 701-306-7164
Contact Email tom@borderconstruction.net
Status Information
Name Complete Date
Application Submittal Yes 9/2/2021 7:54:00 AM
Completeness Review Yes 9/2/2021 7:54:09 AM
Plan Review Fee Payment Yes 9/2/2021 7:58:01 AM
Returned for Revisions Yes 9/15/2021 10:17:39 AM
Staff Review Yes 9/15/2021 10:17:17 AM
Resubmission Yes 9/16/2021 4:24:06 PM
Staff Review Yes 9/16/2021 4:24:50 PM
Approval Yes 9/16/2021 4:25:03 PM
Issuance Yes 10/5/2021 1:04:30 PM
Certificate of Completion Yes 4/18/2022 8:12:44 AM
Finalize No
Fees
Type Amount Paid
Building $5,392.50 Yes
Plan Review $1,035.30 Yes
Plan Review $43.20 No
Reviews
Division Status Reviewer
Inspections Complete / Approved Doug Desotel
Engineering Complete / Approved Christine Goldader
Planning Complete / Approved Kylie Bagley
Fire Complete / Approved Ryan Erickson
Inspections Complete / Approved Doug Desotel
Review Comments
Division Status Comment
Inspections Resolved Have the alternates been approved? and if so, has the value been included in the value of the work?
Inspections Resolved Sheet A5.1 details #10 and #30 shows the sink height at 36", This will not comply with 2018 IBC section 1109.3 and A117.1 section 606.3.
Inspections Resolved If changes occur to the plans or specifications as a result of this review or for any other reason, revisions shall be issued as required and forwarded to this office.
Inspections Resolved A copy of this review, all responses, plans or specifications changes, or any other subsequent information pertaining to this project shall be provided to the contractor for his information.
Inspections Resolved This building and its associated site shall be accessible per IBC Section 1009, Chapter 11 and ANSI.
Inspections Resolved Complete and return the following form: ADAAG Conformance Statement (return copy, send original to address shown on the form)
Inspections Resolved Safety glazing shall be provided as required per IBC Chapter 24.
Inspections Resolved Fire extinguishers shall be provided per IBC Section 906 and during construction per IBC Section 3309.
Inspections Withdrawn You will be required to provide egress illumination as described in IBC section 1008 and illuminated exit signs per section 1013.
Inspections Resolved Suspended ceiling spaces used as plenums shall comply with IMC Chapter 6.
Inspections Resolved Will there be separate prime contractors on this project and are the values of all sub contractors included on the permit application?
Inspections Resolved If this project has separate Prime contractors, they will be required to acquire a building permit in addtion to their respective trade permit. Please repond if separate permits will be required.
Inspections
Type Date Status Inspection Items
Framing 12/13/2021 2:00:00 PM Passed
Certificate of Occupancy 4/18/2022 8:15:00 AM Passed
Certificate of Occupancy 4/29/2022 10:43:53 AM Passed
Final Building 4/14/2022 10:30:00 AM Passed
Final Building 4/29/2022 10:00:00 AM Passed
Above Ceiling Electrical 3/9/2022 2:05:00 PM Failed
  • Need to support Wafer lights by grid not ceiling tile
  • Need to support some fixture whips.
Above Ceiling Electrical 3/10/2022 9:45:00 AM Passed
  • Need to support Wafer lights by grid not ceiling tile
  • Need to support some fixture whips.
Above Ceiling Electrical 3/22/2022 9:30:00 AM Passed
Rough Electrical 12/8/2021 2:30:00 PM Passed
Final Electrical 4/13/2022 10:10:00 AM Failed
  • Need to GFCI island receptacles in 2nd floor break area.
  • Need to GFCI TV receptacle above sink in 2nd floor break area.
  • Have baseboard heater under receptacle in drive through area.
  • Fix corded fixtures that enter boxes incorrectly.
Final Electrical 4/14/2022 10:00:00 AM Passed
  • Need to GFCI island receptacles in 2nd floor break area.
  • Need to GFCI TV receptacle above sink in 2nd floor break area.
  • Have baseboard heater under receptacle in drive through area.
  • Fix corded fixtures that enter boxes incorrectly.
Waste and Vent 12/2/2021 12:00:00 PM Failed
Waste and Vent 4/12/2022 9:15:00 AM Passed
Final Plumbing 4/12/2022 9:30:00 AM Passed
Final Electrical 11/14/2022 12:55:00 PM Passed
Contractors
Name License
Border Construction LLC 57847A

Documents

View, download, and upload documents here.

Existing Documents
  • Certificate of Completion.docx (4/18/2022)
  • Permit.pdf (10/5/2021)
About This Site

This site allows you to search permit data on-line. You may also create an account to submit permit applications, track the progress, and make payments.

Need help?

We’ve created a webpage that explains each permit or registration step-by-step and gives you detailed information about fees, required forms and related items.

Online Help >
Report a Problem

Trouble with your application or inspection request? Give us a call! 701.241.1561