Fire |
Resolved |
Fence gates are required to comply with IFC 503 and 503.5. Access is required to be maintained to fire hydrant and to maintain access to Track building to the south. |
Inspections |
Open |
Please provide a separate value for the parking lot and site work for this project or apply for a parking lot permit through the web portal. We permit that separately so that the paving, striping, and landscaping don’t hold up the building final inspections. If you apply for the parking lot permit on-line, please note whether the value was included in the original submission for the building. |
Inspections |
Open |
Sheet S002, Special inspections and reporting (if required) shall be provided on this project per IBC Sections 1704 and 1705. The permit applicant shall submit a statement of special inspections as required by IBC Sections 1704 and 1705. A copy of a summary is attached for your use. Please provide a list of special inspectors and their qualifications. Special inspector shall provide this office with a final report documenting required special inspections and correction of any discrepancies noted in the inspections as required by IBC Section 1704.2.4. A certificate of occupancy may not be issued for this project until the final report is received by this office. |
Inspections |
Resolved |
Sheet S001 Foundation notes ,Please provide the Geotechnical report for the building site. |
Inspections |
Open |
Provide information on compliance with the International Energy Conservation Code 2021. Comply with IECC Sections 401-405 or 407 as required. Computer-generated documentation (e.g. ComCheck) will be allowed to indicate total building performance as per IECC Section 407.6. Your summary must include building envelope, mechanical systems, water heating, interior lighting and electrical power systems. |
Inspections |
Open |
The registered designer for this project shall approve the engineered truss design drawings as they become available and forward them to this office for review. (Provide the stamped drawings) |
Inspections |
Open |
Will there be separate prime contractors on this project and are the values of all sub contractors included on the permit application? |
Inspections |
Open |
Will you be installing a type one hood in this lease space? |
Inspections |
Open |
All type one hoods must have Clearances to combustibles as 2021 IMC section 507.2.6. |
Inspections |
Open |
Will you be installing a type one hood in this lease space? |
Inspections |
Open |
All type one hoods must have Clearances to combustibles as 2021 IMC section 507.2.6. |
Inspections |
Resolved |
Provide the stamped engineered roof truss drawings for the building. |
Inspections |
Open |
This building and its associated site shall be accessible per IBC Section 1009, Chapter 11 and ANSI. |
Inspections |
Open |
Complete and return the following form: ADAAG Conformance Statement (return copy, send original to address shown on the form) |
Inspections |
Open |
If changes occur to the plans or specifications as a result of this review or for any other reason, revisions shall be issued as required and forwarded to this office. |
Inspections |
Open |
Fire extinguishers shall be provided per IBC Section 906 and during construction per IBC Section 3309. |