Engineering |
Resolved |
Engineering Department comments for this project can be found under the parking lot project for the same address. |
Inspections |
Resolved |
If changes occur to the plans or specifications as a result of this review or for any other reason, revisions shall be issued as required and forwarded to this office. |
Inspections |
Resolved |
A copy of this review, all responses, plans or specifications changes, or any other subsequent information pertaining to this project shall be provided to the contractor for his information. |
Inspections |
Resolved |
This building and its associated site shall be accessible per IBC Section 1009, Chapter 11 and ANSI. |
Inspections |
Resolved |
Complete and return the following form: ADAAG Conformance Statement (return copy, send original to address shown on the form) |
Inspections |
Resolved |
Safety glazing shall be provided as required per IBC Chapter 24. (3-1 Sheet Note 1G1.2) |
Inspections |
Resolved |
There is a maximum of ½” height for the thresholds into the building per IBC Section 1010.1.7. (3-1-detail 2/A3.1 |
Inspections |
Resolved |
Special inspections and reporting (if required) shall be provided on this project per IBC Sections 1704 and 1705. The permit applicant shall submit a statement of special inspections as required by IBC Sections 1704 and 1705. A copy of a summary is attached for your use. Please provide a list of special inspectors and their qualifications. Special inspector shall provide this office with a final report documenting required special inspections and correction of any discrepancies noted in the inspections as required by IBC Section 1704.2.4. A certificate of occupancy may not be issued for this project until the final report is received by this office. |
Inspections |
Resolved |
Restrooms – Tile must be smooth and non-porous. Grout must be non-sanded and sealed. FRP must be sealed with quality sealant to be compliant. |
Inspections |
Resolved |
Per IBC Chapter 29 you are required to provide a service sink. Please provide location on plans and the wall surfaces. (not required) |
Inspections |
Open |
Provide a list of sub contractors that will be working on this project. (3-1 Deferred) |
Inspections |
Resolved |
Please provide the Geotechnical report for the building site. Sheet S1.1 |
Inspections |
Resolved |
Sheets C4.0 and A2.1, Shows the west exterior wall 5' from the property line. Provide wall ratings and opening protection requirements as per tables 602 and 705.8 (3-1 section 705.8.1 exception 2) |
Inspections |
Resolved |
Sheet C6.0 , Will there be any elevation changes that will require a ramp between the car wash area and the equipment room? |
Inspections |
Resolved |
Sheet 1G1.2 special Inspections, We are currently under the 2018 IBC. |
Inspections |
Resolved |
Provide the geotechnical report for the building site. |
Inspections |
Resolved |
Provide information on compliance with the International Energy Conservation Code 2018. Comply with IECC Sections 401-405 or 407 as required. Computer-generated documentation (e.g. ComCheck) will be allowed to indicate total building performance as per IECC Section 407.6. Your summary must include building envelope, mechanical systems, water heating, interior lighting and electrical power systems. |
Inspections |
Resolved |
Sheet 1G1.2 Deferred submittals, Provide the Engineered Shop drawings for the vacuum Canopy (3-1 Deferred sub)( Rec 3/10/21) |