Permit · 2006-0320-NEWC

Type: New Building

Location: 4302 17 Ave S

Description: Construct new building on previously permitted foundation.

Created By: Melissa Gaulrapp


Overview

A listing of the key features of the permit. To print this information, use the button below.

Printer Friendly Version

Details

Name Value
Sprinkler Required True
1st Floor Area (ft²) 13787.00
Number of Floors 4
2nd Floor Area (ft²) 6866.00
3rd Floor and Above Area (ft²) 7432.00
Basement Area Finished (ft²) 1033.00
Total Basement Area (ft²) 1033.00
Total Construction Area (ft²) 30478.00
Construction Height (ft) 48.50
Project Costs 5600000.00
Impervious Surface Area (ft²)
Below Grade Construction Slab on Grade
Foundation Type Poured Concrete
Number of Bathrooms
Number of Bedrooms
Total Land Disturbance Area (ft²)
Dwelling Units (DU) Added
Number of Exits
Building Use Group (Primary) B Business
Detailed Use
Establishment Name RRHS Building
Work Performed By Contractor
Roof Material Single Ply Membrane
Crane Required
Contact Name Mark Singleton
Business Associated With Great States
Contact Phone Number 701-371-8791
Contact Email mark@greatstates.us

Status Information

Name Complete Date
Application Submittal Yes 6/9/2020 10:02:07 AM
Completeness Review Yes 6/9/2020 10:02:29 AM
Plan Review Fee Payment Yes 6/9/2020 10:02:39 AM
Staff Review Yes 6/26/2020 4:15:09 PM
Returned for Revisions Yes 7/1/2020 4:01:36 PM
Resubmission Yes 7/1/2020 4:01:41 PM
Staff Review Yes 7/1/2020 4:02:10 PM
Approval Yes 7/1/2020 4:02:18 PM
Issuance Yes 7/7/2020 1:50:37 PM
Certificate of Occupancy No
Finalize No

Fees

Type Amount Paid
Building $22,976.50 Yes
Plan Review $4,595.30 Yes

Reviews

Division Status Reviewer
Inspections Complete / Approved Peter Valkov
Planning Complete / Approved Kylie Bagley
Fire Complete / Approved Ryan Erickson
Inspections Complete / Approved Peter Valkov

Review Comments

Division Status Comment
Inspections Resolved Is the exterior canopy shown on drawings provided with sprinkler heads?
Inspections Resolved Please explain how is the common path from basement meeting the code requirements? It is not clear.
Inspections Resolved Is the stage shown on plans compliant with all applicable subsections to IBC, s. 410? It is not clear. Please comment and confirm.
Inspections Resolved Open sink required in kitchen 111

Inspections

Type Date Status Inspection Items
Investigation / Walk-Through 7/7/2021 3:30:00 PM Passed
Energy / Insulation Unscheduled
Energy / Insulation 3/16/2021 2:30:00 PM Passed
Energy / Insulation 3/29/2021 10:00:00 AM Failed
Consultation 3/30/2021 11:20:55 AM Passed
Energy / Insulation 4/1/2021 2:00:00 PM Passed
Energy / Insulation 4/26/2021 2:30:00 PM Failed
Energy / Insulation 4/27/2021 10:00:00 AM Passed
Energy / Insulation 6/11/2021 11:30:00 AM Passed
Consultation 7/7/2021 2:00:00 PM Passed
Slab 8/25/2020 9:30:00 AM Passed
Footing 8/26/2020 3:43:06 PM Passed
Slab 1/12/2021 1:00:00 PM Passed
Slab 2/19/2021 1:45:00 PM Passed
Foundation 5/11/2021 9:45:00 AM Passed
UG Fire 9/18/2020 1:30:00 PM Passed
Above Ceiling Building Unscheduled
Framing 3/5/2021 2:30:00 PM Failed
Framing 3/10/2021 1:30:00 PM Passed
Framing 3/10/2021 1:30:00 PM Void
Framing 3/19/2021 8:30:00 AM Passed
Framing 4/21/2021 10:15:00 AM Passed
Framing 5/25/2021 9:00:00 AM Passed
Final Building Unscheduled
Temporary Electrical Service 8/17/2020 10:55:00 AM Passed
Rough Electrical 3/5/2021 10:15:00 AM Passed
Rough Electrical 4/20/2021 11:30:00 AM Passed
Rough Electrical 4/29/2021 11:25:00 AM Passed
Rough Electrical 5/11/2021 11:00:00 AM Passed
Rough Electrical 5/21/2021 10:00:00 AM Passed
Above Ceiling Electrical 6/16/2021 1:00:00 PM Passed
Rough Electrical 7/9/2021 11:30:00 AM Passed
Above Ceiling Electrical 7/21/2021 9:40:00 AM Passed
Above Ceiling Electrical 7/29/2021 10:10:00 AM Passed
Final Electrical Scheduled
Electrical Service 4/20/2021 11:15:00 AM Passed
Plumbing Ground Work 8/24/2020 2:30:00 PM Failed
Plumbing Ground Work 8/25/2020 1:15:00 PM Passed
Above Ground Hydrostatic Test 7/20/2021 10:00:00 AM Failed
Above Ground Hydrostatic Test 7/29/2021 2:00:00 PM Passed
Final Fire Sprinkler 7/29/2021 2:00:00 PM Passed
Waste and Vent 2/26/2021 2:45:00 PM Failed
Waste and Vent 3/10/2021 12:30:00 PM Failed
Waste and Vent 3/31/2021 10:45:00 AM Failed
Waste and Vent 4/8/2021 11:30:00 AM Passed
Final Plumbing Unscheduled
Final Fire Alarm 7/29/2021 2:00:00 PM Failed
Final Fire Alarm 7/30/2021 11:00:00 AM Passed
Above Ceiling Electrical 6/16/2021 12:45:00 PM Passed
Final Electrical Scheduled
Final Fire 7/29/2021 2:00:00 PM Passed

Contractors

Name License
Great States Construction 56184A
Existing Documents
  • Construction Drawings.pdf (6/9/2020)
  • Permit Application.pdf (6/9/2020)
  • 19086 Stormwater Technical Memorandum - Signed and Compiled_20-8-18.pdf (8/19/2020)
  • 19086_C_20-8-18.pdf (8/19/2020)
  • 19086-Rendering_20-08-19.jpg (8/19/2020)
  • Permit.docx (7/7/2020)
  • CommentLetter1.doc (6/26/2020)
  • 20-007 City Review Response 6-30-20.pdf (7/1/2020)
  • 20-007 RRHS_ADAAG Conformance Statement_COPY.PDF (7/1/2020)
  • 20-073 Mechanical Plan Revision 2.pdf (7/1/2020)
  • 39910.pdf (7/1/2020)

About This Site

This site allows you to search permit data on-line. You may also create an account to submit permit, track the progress, and make payments.

Need help?

We’ve created a webpage that explains each permit or registration step-by-step and gives you detailed information about fees, required forms and related items.

Online Help

Report a Problem

Trouble with your application or inspection request? Give us a call! 701.241.1561.

© 2021 – Davenport Group USA     |     Terms of Use