2008-0901-NEWC

Permit

New Building

Type

4330 13 Ave S

Location

Overview

A listing of the key features of the permit. To print this information, use the button below.

Printer Friendly Version

Description

Construct new building for use as a bank.

Details
Name Value
Sprinkler Required False
1st Floor Area (ft²) 3308.00
Number of Floors 1
2nd Floor Area (ft²)
3rd Floor and Above Area (ft²)
Basement Area Finished (ft²)
Total Basement Area (ft²)
Total Construction Area (ft²) 3308.00
Construction Height (ft) 21.50
Project Costs 2249000.00
Floodproof
Impervious Surface Area (ft²)
Below Grade Construction Slab on Grade
Foundation Type Poured Concrete
Number of Bathrooms
Number of Bedrooms
Total Land Disturbance Area (ft²)
Dwelling Units (DU) Added 0
Number of Exits 2
Building Use Group (Primary) B Business
Detailed Use Office, Bank
Establishment Name JP Morgan Chase
Work Performed By Contractor
Occupant Load 33
Roof Material
Electrical Work Yes - by Contractor
Plumbing Work Yes - by Contractor
Gas Piping Work Yes - by Contractor
Heating or Air Conditioning Work Yes - by Contractor
Crane Required
Contact Name Carlos Davalos
Contact Type Architect
Contact Phone Number 773-559-3586
Contact Email davalos@tapchicago.com
Status Information
Name Complete Date
Application Submittal Yes 8/25/2020 12:09:15 PM
Completeness Review Yes 8/26/2020 7:50:34 AM
Plan Review Fee Payment Yes 8/26/2020 10:25:54 AM
Staff Review Yes 9/24/2020 9:59:25 AM
Returned for Revisions Yes 10/13/2020 11:48:45 AM
Resubmission Yes 10/13/2020 11:48:50 AM
Staff Review Yes 10/13/2020 11:51:24 AM
Approval Yes 10/14/2020 11:23:20 AM
Issuance Yes 10/16/2020 2:32:47 PM
Inspections Complete Yes 7/21/2021 8:44:29 AM
Certificate of Occupancy Yes 6/7/2021 12:02:44 PM
Finalize Yes 7/21/2021 8:44:47 AM
Fees
Type Amount Paid
Building $9,572.50 Yes
Plan Review $1,914.50 Yes
Reviews
Division Status Reviewer
Inspections Complete / Approved Peter Valkov
Engineering Complete / Approved Ron Solberg
Planning Complete / Approved Kylie Bagley
Fire Complete / Approved Ryan Erickson
Inspections Complete / Approved Peter Valkov
Review Comments
Division Status Comment
Planning Resolved How many square feet of open space are provided on site?
Planning Resolved 43 1/2 Street S is a local street, which requires 1 street tree per 35 feet.
Planning Resolved Verify driveway approach with Engineering
Inspections Resolved is RP-05 on Sheet A1.3 a roof access hatch or something else? Please explain. (IMC section 306.5)
Inspections Resolved Is corridor 121 fire rated per IBC, table 1020.1? Please explain and provide detailing and listed assemblies used in the design.
Engineering Resolved Engineering Department comments for this project can be found under the parking lot project for the same address.
Inspections
Type Date Status Inspection Items
Investigation / Walk-Through 2/24/2021 2:14:19 PM Passed
Investigation / Walk-Through 3/10/2021 2:46:23 PM Passed
Consultation 1/25/2021 11:18:05 AM Passed
Consultation 3/9/2021 11:00:00 AM Passed
Grounding Electrode 12/21/2020 10:49:41 AM Passed
Footing 12/21/2020 9:15:00 AM Passed
Foundation 1/4/2021 10:00:00 AM Passed
Slab 2/25/2021 8:00:00 AM Passed
Rough Fire 5/26/2021 1:15:00 PM Failed
Framing 1/25/2021 9:00:00 AM Passed
Framing 3/10/2021 3:00:00 PM Passed
Framing 3/11/2021 1:00:00 PM Passed
Certificate of Occupancy 6/7/2021 12:00:00 PM Passed
Final Building 5/25/2021 2:15:00 PM Failed
Final Building 6/1/2021 3:00:00 PM Failed
Final Building 6/7/2021 8:45:00 AM Passed
Final Building 5/25/2021 2:30:00 PM Failed
Final Building 7/21/2021 2:30:00 PM Failed
Temporary Electrical Service 11/17/2020 10:00:00 AM Passed
Above Ceiling Electrical 5/5/2021 2:15:00 PM Failed
  • Cnt use TC cable in the manner it was used. Must remove from ceiling.
Above Ceiling Electrical 5/7/2021 10:15:00 AM Passed
  • Cnt use TC cable in the manner it was used. Must remove from ceiling.
Rough Electrical 3/10/2021 11:30:00 AM Passed
Rough Electrical 3/17/2021 12:45:00 PM Passed
Electrical Service 4/26/2021 9:30:00 AM Passed
Final Electrical 5/28/2021 10:35:00 AM Failed
  • 1. Need panel schedules and source labels
  • 2. Need face plates for receptacles.
  • 3.Baseboard heater not powered. Wires hanging out.
  • 4. Need dated fault current label for RTU
  • 5. Need to Ground RTU disconnect.
  • 6. 12×12 j-box at RTU has 2 ground wires under 1 lug. Separate into individual lugs.
  • 7 12×12 j-box at mini split units has to many wires under 1 lug. Must install ground bar in this j-box and separate wires under individual terminations.
  • 8. Bonding jumper to light pole ground rods must be minimum #8 from rod to pole and must ground pole at hand hole location.
Final Electrical 6/2/2021 2:00:00 PM Passed
  • 1. Need panel schedules and source labels
  • 2. Need face plates for receptacles.
  • 3.Baseboard heater not powered. Wires hanging out.
  • 4. Need dated fault current label for RTU
  • 5. Need to Ground RTU disconnect.
  • 6. 12×12 j-box at RTU has 2 ground wires under 1 lug. Separate into individual lugs.
  • 7 12×12 j-box at mini split units has to many wires under 1 lug. Must install ground bar in this j-box and separate wires under individual terminations.
  • 8. Bonding jumper to light pole ground rods must be minimum #8 from rod to pole and must ground pole at hand hole location.
  • 1. Need panel schedules and source labels
  • 2. Need face plates for receptacles.
  • 3.Baseboard heater not powered. Wires hanging out.
  • 4. Need dated fault current label for RTU
  • 5. Need to Ground RTU disconnect.
  • 6. 12×12 j-box at RTU has 2 ground wires under 1 lug. Separate into individual lugs.
  • 7 12×12 j-box at mini split units has to many wires under 1 lug. Must install ground bar in this j-box and separate wires under individual terminations.
  • 8. Bonding jumper to light pole ground rods must be minimum #8 from rod to pole and must ground pole at hand hole location.
Rough Fire Alarm 6/1/2021 2:28:12 PM Passed
Final Fire Alarm 6/1/2021 2:27:45 PM Passed
Contractors
Name License
Gardner Builders

Documents

View, download, and upload documents here.

Existing Documents
  • Certificate of Occupancy.pdf (6/7/2021)
  • Permit.docx (10/16/2020)
  • Receipt 1.doc (10/14/2020)
  • Receipt.doc (8/26/2020)
  • Receipt.pdf (10/27/2020)
  • CommentLetter1_200908103935.doc (9/8/2020)
  • 13th Ave Project Manual.pdf (9/24/2020)
  • ADAAG Conformance Statement.pdf (9/24/2020)
  • Chase Fargo - 13th Ave - Architectural.pdf (9/24/2020)
  • Chase Fargo - 13th Ave - Civil and Landscape.pdf (9/24/2020)
  • Fargo Chase Bank Stormwater Report.pdf (9/24/2020)
  • Plan Review Responses 200922.pdf (9/24/2020)
About This Site

This site allows you to search permit data on-line. You may also create an account to submit permit applications, track the progress, and make payments.

Need help?

We’ve created a webpage that explains each permit or registration step-by-step and gives you detailed information about fees, required forms and related items.

Online Help >
Report a Problem

Trouble with your application or inspection request? Give us a call! 701.241.1561