2008-0221-NEWC

Permit

New Building

Type

4462 30 Ave S

Location

Overview

A listing of the key features of the permit. To print this information, use the button below.

Printer Friendly Version

Description

Construct three-story, 84-unit multi-family building for use as an assisted living facility with associated support and assembly spaces. Permits obtained for work to be completed, Siding 2212-0433-SIDG. Front Covered area canopy 2212-0432. and Corridor Door, Frames/ Glazing 2212-0431

Details
Name Value
Sprinkler Required True
1st Floor Area (ft²) 39050.00
Number of Floors 4
2nd Floor Area (ft²) 38520.00
3rd Floor and Above Area (ft²) 20935.00
Basement Area Finished (ft²) 20125.00
Total Basement Area (ft²) 20125.00
Total Construction Area (ft²) 118630.00
Construction Height (ft) 34.50
Project Costs 12450000.00
Floodproof True
Impervious Surface Area (ft²)
Below Grade Construction Partial Basement
Foundation Type Poured Concrete
Number of Bathrooms
Number of Bedrooms 92
Total Land Disturbance Area (ft²)
Dwelling Units (DU) Added 84
Number of Exits 5
Building Use Group (Primary) I-1 Institutional Supervised Environment
Detailed Use Long-Term Care
Establishment Name Elliott Place
Work Performed By Contractor
Occupant Load 593
Roof Material
Electrical Work Yes - by Contractor
Plumbing Work Yes - by Contractor
Gas Piping Work Yes - by Contractor
Crane Required
Contact Name Kyle Mikkelsen
Business Associated With BC Contracting
Contact Phone Number 701-356-3010
Contact Email kmikkelsen@bccontracting co.com
Contact Type
Status Information
Name Complete Date
Application Submittal Yes 8/6/2020 12:36:48 PM
Completeness Review Yes 8/10/2020 1:41:35 PM
Plan Review Fee Payment Yes 8/10/2020 1:42:10 PM
Staff Review Yes 12/2/2020 2:05:33 PM
Returned for Revisions Yes 12/2/2020 2:06:18 PM
Resubmission Yes 12/2/2020 2:06:24 PM
Staff Review Yes 3/25/2021 8:00:39 AM
Approval Yes 3/25/2021 8:02:31 AM
Issuance Yes 7/7/2021 8:42:20 AM
Elevation Stake Request No
Address Verification Yes 11/30/2022 9:38:22 AM
Certificate of Occupancy Yes 12/20/2022 9:39:08 AM
Finalize Yes 12/20/2022 9:48:53 AM
Post Shot Requested No
Fees
Type Amount Paid
Building $50,376.50 Yes
Building ($50,376.50) Yes
Plan Review $10,075.30 Yes
Reviews
Division Status Reviewer
Inspections Complete / Approved Peter Valkov
Engineering Revisions Needed Ron Solberg
Planning Complete / Approved Maggie Squyer
Fire Complete / Approved Ryan Erickson
Floodplain Complete / Approved Peter Valkov
WSEIA 41 Complete / Approved Peter Valkov
Health Complete / Approved Hunter Hubrig
Inspections Complete / Approved Peter Valkov
Engineering Complete / Approved Ron Solberg
Planning Complete / Approved Maggie Squyer
Fire Complete / Approved Ryan Erickson
Floodplain Complete / Approved Peter Valkov
WSEIA 41 Complete / Approved Peter Valkov
Health Complete / Approved Hunter Hubrig
Addressing Complete / Approved Wayne Lorshbough
Review Comments
Division Status Comment
Engineering Resolved Engineering Department comments for this project can be found under the parking lot project for the same address.
Planning Resolved Karl Foerster and Daylilies are perennial plants. Please verify if these will be #1 container or #2 container.
Planning Resolved How many square feet of open space are provided on site?
Health Open Discussed accessibility of handsink in kitchen area with architect.
Inspections Resolved Plans not clear - is this building provided with a sprinkler system? The table on sheet CODE says: No. Please clarify your information in Project Information table and state the type(s) of sprinkler system(s) intended for use in this design per IBC, sect 903.2.6.
Inspections Resolved Project does not clarify code information pertaining to relation between S-2 versus I-1 type of occupancy, nor does clarify the distinction between the I-A versus V-A construction. Please clarify areas, fire resistance ratings required, separations required, etc.
Inspections Resolved Project shows 0 hours fire-resistance ratings, while chapter 6 in IBC requires both type I-A and Type V-A construction types to be provided with certain degrees of fire-resistive construction. Please re-design this project to meet the code requirements for fire resistance. Use table 601 to guide your decisions.
Inspections Resolved Storage units and miscellaneous other rooms are shown in type S-2 occupancy. This is not allowed per IBC, section 311.3. Please revise plans to meet code requirements.
Inspections Resolved Please explain how is type I-A construction separated from Type V-A construction, as the Project Information Table does not clarify this.
Inspections Resolved Plans show two story opening between ground floor and space 200 - Overlook. While this is allowed in other types of occupancies - I occupancies are not. Please consider IBC, section 712.1.9- Item #4. Please revise plans to meet code compliance.
Inspections Resolved Please provide areas per floor for this building. Project Table does not clarify how are allowable areas calculated to meet the requirements in IBC, chapter 5. Please provide drawings showing areas, calculations for allowable areas, calculations for multi-story mixed occupancies per section 506.2.4, etc to demonstrate project is code compliant.
Inspections Resolved Provide calculations for height and number of stories per IBC, chapter 5.
Inspections Resolved Please provide all tested labeled rated assemblies - horizontal and vertical to demonstrate compliance with the IBC applicable provisions.
Inspections Resolved Declared full and true value for this project appears to be low. City of Fargo is using the ICC guidelines for types of construction and occupancy and we grant 20% discount for locality. Please verify the true and full value of this building and respond.
Inspections Resolved Is emergency power provided for the elevators in this building? IBC, sect. 1009.4 - Please explain.
Inspections Resolved Sheet A275 shows wood construction at the I-A construction level. Please note this is not allowed. Please review and revise drawings to meet the construction type. Otherwise, explain how you meet the code requirements at that level.
WSEIA 41 Resolved Building is both in 41' and FEMA. 907.8' required per WSEIA and shown on civil plans.
WSEIA 41 Resolved Flood proofing Certificate required for lower / underground level.
Inspections Resolved Please provide a copy of the NTI's geotechnical exploration report showing respectively 2000 and 2500 PSF for strip / pad footings.
Inspections Resolved Accessible parking shall be provided at each parking facility - IBC, sect. 1106.1. Underground parking shows no accessible facilities. Please revise plans to meet code.
Inspections Resolved Per IBC, section 1107.5 - Accessible and Type B units are required for this facility. Code plans on sheet CODE do not reflect this requirement. Please provide all necessary information, calculations, and detailing to demonstrate code compliance.
Inspections Resolved Stair 1 and Stair 5 have exit doors at ground level that appear very close to other construction. Please explain how these two locations meet the requirements of IBC, section 1023.7 - Interior Exit Stairway and Ramp exterior walls.
Inspections Resolved Please verify with Engineering Department of City of Fargo if a floodproof certificate will be required for this structure lower (basement parking level) floor and respond.
Inspections Resolved Is the electrical room provided with panic hardware per IBC, sect. 1010.1.10
Inspections Resolved Are all doors and windows facing interior fire-rated corridors fire-rated? Please comment.
Inspections Resolved Are mechanical shafts penetrating floor levels or other rated assemblies fire-rated? Plans are not clear. Please explain and provide information on code sheet. (IBC, section 713. ). Note trash chute and rooms accessing it shall meet these requirements as well. Plans do not clarify compliance with IBC, sect. 713.13.
Inspections Resolved How is section 1020.6 - Corridor Continuity addressed for open spaces shown on plans directly open to the rated corridors? Please explain. Note for instance room #205 - Fireside Lounge.
Inspections Resolved How many exits are provided for this facility? Please provide information, distance to exit, and occupants calculated at each exit per IBC, section 107.2.3. Please also consider convergence from garage level and upper levels at ground per IBC, sect. 1005.6. Please respond.
Inspections
Type Date Status Inspection Items
Investigation / Walk-Through 4/4/2022 1:00:00 PM Passed
Investigation / Walk-Through 6/9/2022 1:15:00 PM Passed
Investigation / Walk-Through 6/10/2022 8:16:22 AM Passed
Investigation / Walk-Through 11/14/2022 1:27:40 PM Failed
Investigation / Walk-Through 11/18/2022 1:00:00 PM Passed
Investigation / Walk-Through 11/22/2022 1:00:00 PM Passed
Investigation / Walk-Through 12/19/2022 9:20:08 AM Passed
Investigation / Walk-Through 12/20/2022 10:00:00 AM Failed
Energy / Insulation 10/22/2021 9:50:28 AM Passed
Energy / Insulation 7/13/2022 1:45:00 PM Failed
Energy / Insulation 7/19/2022 10:00:00 AM Failed
Energy / Insulation 7/19/2022 3:00:00 PM Passed
Energy / Insulation 7/25/2022 8:45:00 AM Passed
Energy / Insulation 8/5/2022 2:45:00 PM Passed
Footing 8/11/2021 8:30:00 AM Passed
Footing 8/13/2021 1:45:00 PM Passed
Footing 8/18/2021 2:00:00 PM Passed
Footing 8/19/2021 2:00:00 PM Passed
Footing 8/25/2021 1:00:00 PM Passed
Footing 8/31/2021 1:00:00 PM Passed
Footing 9/9/2021 3:00:00 PM Passed
Footing 9/15/2021 1:30:00 PM Passed
Footing 9/22/2021 12:53:11 PM Passed
Foundation 8/16/2021 1:00:00 PM Passed
Foundation 9/22/2021 10:00:00 AM Passed
Foundation 9/24/2021 11:45:00 AM Passed
Foundation 10/1/2021 10:30:00 AM Passed
Foundation 10/6/2021 12:15:00 PM Passed
Foundation 10/19/2021 11:30:00 AM Passed
Foundation 10/22/2021 10:00:00 AM Passed
Foundation 10/26/2021 11:45:00 AM Passed
Foundation 11/2/2021 12:30:00 PM Passed
Foundation 11/5/2021 11:15:00 AM Passed
Slab 11/12/2021 9:00:00 AM Passed
Slab 11/15/2021 8:45:00 AM Passed
Slab 11/29/2021 8:00:00 AM Passed
Slab 11/29/2021 8:45:00 AM Passed
Above Ceiling Building 11/16/2022 2:00:00 PM Failed
Above Ceiling Building 11/18/2022 12:03:35 PM Failed
Above Ceiling Building 11/21/2022 10:00:00 AM Passed
Above Ceiling Building 11/28/2022 1:15:00 PM Failed
Above Ceiling Building 12/6/2022 2:45:00 PM Failed
Framing 4/4/2022 1:00:00 PM Passed
Framing 6/9/2022 11:15:00 AM Passed
Framing 6/28/2022 10:00:00 AM Failed
Framing 6/30/2022 10:00:00 AM Failed
Framing 7/8/2022 8:45:00 AM Passed
Framing 7/13/2022 1:45:00 PM Failed
Framing 7/19/2022 3:21:46 PM Failed
Framing 7/20/2022 3:00:00 PM Failed
Framing 7/21/2022 10:00:00 AM Passed
Framing 7/22/2022 1:00:00 PM Passed
Framing 7/28/2022 9:00:00 AM Failed
Framing 8/5/2022 2:45:00 PM Failed
Framing 8/9/2022 9:00:00 AM Passed
Framing 8/12/2022 11:00:00 AM Passed
Framing 8/15/2022 12:30:00 PM Failed
Framing 8/15/2022 2:13:25 PM Passed
Framing 8/18/2022 10:00:00 AM Failed
Framing 8/26/2022 8:45:00 AM Failed
Framing 8/31/2022 1:45:00 PM Failed
Framing 9/7/2022 10:45:00 AM Failed
Framing 9/12/2022 8:15:00 AM Failed
Framing 9/19/2022 12:00:00 PM Failed
Framing 9/20/2022 10:00:00 AM Cancelled
Framing 9/21/2022 9:45:00 AM Failed
Framing 9/26/2022 10:00:00 AM Failed
Framing 9/27/2022 11:15:00 AM Passed
Framing 9/29/2022 8:15:00 AM Failed
Framing 10/6/2022 9:00:00 AM Passed
Framing 10/6/2022 11:00:00 AM Failed
Framing 10/10/2022 9:15:00 AM Failed
Framing 10/11/2022 12:43:05 PM Failed
Framing 10/12/2022 9:15:00 AM Passed
Framing 11/14/2022 12:00:00 PM Passed
Insulation 8/26/2022 11:06:41 AM Passed
Energy / Insulation 8/15/2022 12:30:00 PM Passed
Energy / Insulation 9/12/2022 3:37:54 PM Failed
Energy / Insulation 9/16/2022 12:45:00 PM Failed
Energy / Insulation 9/19/2022 3:22:13 PM Failed
Energy / Insulation 9/20/2022 11:19:20 AM Failed
Energy / Insulation 9/21/2022 10:44:58 AM Passed
Energy / Insulation 9/26/2022 11:02:40 AM Failed
Energy / Insulation 9/27/2022 10:50:18 AM Passed
Energy / Insulation 10/11/2022 11:30:00 AM Failed
Energy / Insulation 10/12/2022 9:00:00 AM Passed
Energy / Insulation 10/24/2022 11:00:00 AM Passed
Energy 9/29/2022 2:38:06 PM Passed
Final Fire 12/9/2022 10:00:00 AM Failed
  • Sprinkler system rerquired - NFPA 13 required
  • Fire Alarm system required - Low frequency required CO detection required
Final Fire 12/16/2022 1:30:00 PM Passed
Final Building 12/16/2022 2:00:00 PM Passed
Final Building 12/15/2022 10:00:00 AM Failed
Investigation / Walk-Through 8/3/2022 3:00:00 PM Passed
Investigation / Walk-Through 11/22/2022 2:00:00 PM Passed
Investigation / Walk-Through 12/6/2022 1:30:00 PM Passed
Temporary Electrical Service 7/29/2021 12:30:00 PM Passed
Temporary Electrical Service 12/20/2021 1:55:00 PM Passed
Rough Electrical 6/29/2022 12:45:00 PM Passed
Rough Electrical 6/30/2022 12:35:00 PM Passed
Rough Electrical 7/26/2022 1:10:00 PM Passed
Rough Electrical 8/3/2022 3:00:00 PM Passed
Rough Electrical 8/15/2022 11:00:00 AM Passed
Rough Electrical 9/7/2022 10:15:00 AM Passed
Rough Electrical 9/9/2022 2:40:00 PM Passed
Rough Electrical 9/20/2022 12:33:00 PM Passed
Rough Electrical 9/27/2022 1:55:00 PM Passed
Electrical Service 10/6/2022 3:40:00 PM Passed
Final Electrical 11/22/2022 1:40:00 PM Failed
  • 308D---Closet storage lights in closet storage space; open box and cable hanging out of wall in bathroom; Need breaker lock for dishwasher.
  • 306D--Label all panel breakers; closet light needs to be closet storage space rated.
  • 301D-closet storage lights needs to be closet storage space rated; missing range hood.
  • 3rd floor Commons are panel--Needs source label, panel schedule, breaker blanks
  • 3rd floor fire place mantel receptacle needs a box extension.
  • 304C-closet storage lights needs to be closet storage space rated; Closet missing light switch.
  • 307C-closet storage lights needs to be closet storage space rated; Circuit 2 not testing properly, no GFCI protection.
  • Remove counter receptacle on microwave circuit and blank box in all units with over the range micrwaves.
  • Finish patios
Final Electrical 11/28/2022 12:55:00 PM Failed
  • 308D---Open box and cable hanging out of wall in bathroom; Need breaker lock for dishwasher.
  • 306D--Label all panel breakers.
  • 301D---Missing range hood.
  • 3rd floor Commons are panel--Needs source label, panel schedule, breaker blanks
  • 3rd floor fire place mantel receptacle needs a box extension.
  • 304C---Closet missing light switch.
  • 307C---Circuit 2 not testing properly, no GFCI protection.
  • Remove counter receptacle on microwave circuit and blank box in all units with over the range micrwaves.
  • Finish patios
  • 208C; 208D--Missing cove heater and stat in bathroom;
  • 204C--Missing panel source label.
  • 200C---Need to install devices in bedroom; Label all breaker in panel.
  • C-wing therapy room--Need to install light on bathroom.
  • 2nd floor area East of elevators missing device--Kitchen area needs all receptacles GFCI'D
  • 206D; 203D--Need to label all breakers properly.
  • D-Wing 2nd floor electrical room---Need panel schedules and source labels. Also need to check wires sizes.
Final Electrical 11/30/2022 10:00:00 AM Failed
  • 308D---Open box and cable hanging out of wall in bathroom; Need breaker lock for dishwasher.
  • 306D--Label all panel breakers.
  • 301D---Missing range hood.
  • 3rd floor Commons are panel--Needs panel schedule, breaker blanks and close up.
  • 3rd floor fire place mantel receptacle needs a box extension.
  • 304C---Closet missing light switch.
  • 307C---Circuit 2 not testing properly, no GFCI protection.
  • Finish patios
  • 208C; 208D--Missing cove heater and stat in bathroom;
  • 204C--Missing panel source label.
  • 200C---Need to install devices in bedroom; Label all breaker in panel.
  • C-wing therapy room--Need to install light on bathroom.
  • 2nd floor area East of elevators missing device--Kitchen area needs all receptacles GFCI'D
  • 206D; 203D--Need to label all breakers properly.
  • D-Wing 2nd floor electrical room---Need panel schedules and source labels. Also need to check wires sizes.
  • Unit 308D, 208C, 208D need breaker locks offs for bathroom cove heaters.
  • 2nd floor area East of elevators missing device---Need breaker locks on rangeas plug not accessible through drawer as there is no drawer on range.
  • All ADA ranges need breaker lock as there is no drawer on range to access receptacle through.
  • A202--missing panel source label.
  • 2nd floor Area A storage room has dampers that need to be wired.
  • 2nd floor area A laundry room---need to finish devising.
  • 2nd floor area A bathroom outside laundry area---Needs arc guard.
  • Need dated fault current labelS for roof top units.
  • Need to witness EM generator transfer.
  • Label short circuit current rating(SCCR) of transfer switches on exterior of transfer switches.
Final Electrical 12/1/2022 12:55:00 PM Failed
  • 3rd floor Commons are panel--Needs panel schedule, breaker blanks and close up.
  • Finish patios
  • 108D;--Missing cove heater and stat in bathroom;
  • C-wing therapy room--Need to install light on bathroom.
  • 2nd floor area East of elevators--Kitchen area needs all receptacles GFCI'D
  • 206D; 203D--Need to label all breakers properly.
  • D-Wing 2nd floor electrical room---Need panel schedules and source labels. Also need to check wires sizes.
  • Unit 308D, need breaker locks offs for bathroom cove heaters.
  • 2nd floor area East of elevators---Need breaker locks on rangeas plug not accessible through drawer as there is no drawer on range.
  • All ADA ranges need breaker lock as there is no drawer on range to access receptacle through.
  • A202, C103--missing panel source label.
  • 2nd floor Area A storage room has dampers that need to be wired.
  • 2nd floor area A laundry room---need to finish devising.
  • 2nd floor area A bathroom outside laundry area---Needs arc guard.
  • Need dated fault current label for roof top units.
  • Need to witness EM generator transfer.
  • Label short circuit current rating(SCCR) of transfer switches on exterior of transfer switches.
  • D101---Need to install and wire range hood or box off NM cable.
  • Main electrical room needs illumination.
  • Main electrical room needs listed panic hardware on the door.
  • Main electrical room needs panel schedules, source labels on sub panels and/or label all breakers.
  • Services need label per 110.22(C)
  • Services need label stating there is on site generator and where it is located.
  • Need to comply with 700.3(F) for maintenance or repair of back up power source.
Final Electrical 12/6/2022 12:35:00 PM Failed
  • Finish patios
  • 108D;--Missing cove heater and stat in bathroom;
  • C-wing therapy room--Need to install light on bathroom.
  • 2nd floor area East of elevators--Kitchen area needs all receptacles GFCI'D
  • 206D; 203D--Need to label all breakers properly.
  • D-Wing 2nd floor electrical room---Need panel schedules and source labels. Also need to check wires sizes.
  • Unit 308D, need breaker locks offs for bathroom cove heaters.
  • 2nd floor area East of elevators---Need breaker locks on rangeas plug not accessible through drawer as there is no drawer on range.
  • All ADA ranges need breaker lock as there is no drawer on range to access receptacle through.
  • A202, C103--missing panel source label.
  • 2nd floor area A laundry room---need to finish devising.
  • 2nd floor area A bathroom outside laundry area---Needs arc guard.
  • Need dated fault current label for roof top units.
  • Need to witness EM generator transfer.
  • Label short circuit current rating(SCCR) of transfer switches on exterior of transfer switches.
  • D101---Need to install and wire range hood or box off NM cable.
  • Main electrical room needs illumination.
  • Main electrical room needs listed panic hardware on the door.
  • Main electrical room needs panel schedules, source labels on sub panels and/or label all breakers.
  • Services need label per 110.22(C)
  • Services need label stating there is on site generator and where it is located.
  • Need to comply with 700.3(F) for maintenance or repair of back up power source.
  • Need information on closet lights, either link to spec on website or original paper copy installation instructions for light. If can't provide than need to replace or remove lights in all closets of all dwelling units.
  • 2nd floor sub panel on the right has #4 feeders supplying it protected by 100A breaker. Should be #3 AWG.
  • 3rd floor electrical room has open boxes; breaker blank missing in panel.
  • Outside condensing units---Seal tight flex needs to be properly secured and supported.
  • Outside condensing units need to have branch circuit cable mechanically fastened to disconnect. Use proper connectors.
  • B106---Loose microwave receptacle.
  • Basement---Box by 2 Daikins is missing KO plug.
  • Basement---Sump pumps need disconnect within site of controller.
  • Basement---Sump pump controller need dated fault current label.
  • Basement---Sump pump cord ends were cut off, which voids the listing of the Sump pump. Going to need to replace sp pumps and add single receptacles to control Sump pumps.
  • Garage entry---Garage door opener needs power and close box above.
  • Elevator feeds which are fed off of an Emergency panel cannot run though a normal power panel.  Going to have to reroute elevator feeds outside normal power panel.
Final Electrical 12/9/2022 9:55:00 AM Failed
  • Need dated fault current label for roof top units.
  • Label short circuit current rating(SCCR) of transfer switches on exterior of transfer switches.
  • D101---Need to install and wire range hood or box off NM cable.
  • Main electrical room needs illumination.
  • Main electrical room needs listed panic hardware on the door.
  • Main electrical room needs panel schedules, source labels on sub panels and/or label all breakers.
  • Services need label per 110.22(C)
  • Services need label stating there is on site generator and where it is located.
  • Need to comply with 700.3(F) for maintenance or repair of back up power source.
  • Need information on closet lights, either link to spec on website or original paper copy installation instructions for light. If can't provide than need to replace or remove lights in all closets of all dwelling units.
  • 2nd floor sub panel on the right has #4 feeders supplying it protected by 100A breaker. Should be #3 AWG.
  • 3rd floor electrical room has open boxes; breaker blank missing in panel.
  • Outside condensing units---Seal tight flex needs to be properly secured and supported.
  • Outside condensing units need to have branch circuit cable mechanically fastened to disconnect. Use proper connectors.
  • B106---Loose microwave receptacle.
  • Basement---Box by 2 Daikins is missing KO plug.
  • Basement---Sump pumps need disconnect within site of controller for both controllers.
  • Basement---Sump pump controllers need dated fault current label on both.
  • Basement---Sump pump cord ends were cut off, which voids the listing of the Sump pump. Going to need to replace sump pumps and add single receptacles to control Sump pumps, for both sump pumps.
  • Garage entry---Garage door opener needs power and close box above.
  • Elevator feeds which are fed off of an Emergency panel cannot run though a normal power panel.  Going to have to reroute elevator feeds outside normal power panel.
  • Car light disconnect needs to be labeled where it is fed from and what it is for. It also needs to be marked for which car is for.
Final Electrical 12/13/2022 10:55:00 AM Failed
  • Label short circuit current rating(SCCR) of transfer switches on exterior of transfer switches.
  • Main electrical room needs listed panic hardware on the door.
  • Services need label per 110.22(C)
  • Services need label stating there is on site generator and where it is located.
  • Need to comply with 700.3(F) for maintenance or repair of back up power source.
  • 2nd floor sub panel on the right has #4 feeders supplying it protected by 100A breaker. Should be #3 AWG.
  • Basement---Sump pumps need disconnect within site of controller for both controllers.
  • Basement---Sump pump controllers need dated fault current label on both.
  • Basement---Sump pump cord ends were cut off, which voids the listing of the Sump pump. Going to need to replace sump pumps and add single receptacles to control Sump pumps, for both sump pumps.
  • Elevator feeds which are fed off of an Emergency panel cannot run though a normal power panel.  Going to have to reroute elevator feeds outside normal power panel.
  • Car light disconnect needs to be labeled where it is fed from and what it is for. It also needs to be marked for which car is for.
Final Electrical 12/15/2022 11:30:00 AM Passed
  • Need to comply with 700.3(F) for maintenance or repair of back up power source.
Plumbing Ground Work 11/3/2021 2:15:00 PM Passed
Plumbing Ground Work 11/23/2021 12:30:00 PM Passed
UG Fire 3/28/2022 1:00:00 PM Passed
Above Ground Hydrostatic Test 11/7/2022 2:02:00 PM Passed
Above Ground Hydrostatic Test 11/28/2022 1:00:00 PM Passed
Rough Fire Sprinkler 7/6/2022 9:00:00 AM Passed
Final Fire Sprinkler 12/9/2022 9:00:00 AM Passed
Waste and Vent 6/28/2022 12:45:00 PM Passed
Final Plumbing 12/6/2022 3:00:00 PM Passed
Waste and Vent 8/24/2022 12:00:00 PM Passed
Final Plumbing 11/28/2022 10:30:00 AM Failed
Final Plumbing 6/19/2023 10:00:00 AM Passed
Sewer Service 9/14/2022 11:30:00 AM Failed
Sewer Service 9/23/2022 11:45:00 AM Failed
Sewer Service 10/5/2022 2:30:00 PM Passed
Final Fire Alarm 12/9/2022 9:00:00 AM Failed
Final Fire Alarm 12/16/2022 1:30:00 PM Passed
Contractors
Name License
BC Contracting 47152A

Documents

View, download, and upload documents here.

Existing Documents
  • 20-092 Civil Revised 10-13-20.pdf (10/15/2020)
  • 202003-1_Elliott Place_Final CD SET_080320.pdf (8/10/2020)
  • City of Fargo_Comm_Permit_Application.pdf (8/10/2020)
  • 20-092 NonRes FP Cert Signed-Struct.pdf (11/5/2020)
  • Certificate of Occupancy.doc (12/20/2022)
  • ComCheck Updated.pdf (11/16/2022)
  • Fee Waiver.pdf (7/7/2021)
  • Intemecent Paint-Inspection.pdf (12/7/2022)
  • Permit.docx (7/7/2021)
  • Inspection Report.pdf (3/27/2023)
  • Inspection Report.xls (3/27/2023)
  • CommentLetter1.doc (8/19/2020)
  • 202003-1_BC-Response_100920.pdf (11/5/2020)
  • 202003-1_Elliott Place_A124 - SECOND FLOOR_112420.pdf (12/2/2020)
  • 3rd floor truss fix.pdf (7/21/2022)
  • Elliot Place - Waived Permit Fees Letter.pdf (7/8/2021)
  • Elliott Place_A001_Revised_100920.pdf (11/5/2020)
  • Elliott Place_A120 A122 A124 A126 PLANS_Revised_100920.pdf (11/5/2020)
  • Elliott Place_ADAAG Conformance Statement.pdf (11/5/2020)
  • Elliott Place_Architectural ComCheck_100920.pdf (11/5/2020)
  • Elliott Place_Bldg Review Analysis_100920.pdf (11/5/2020)
  • Elliott Place_CODE PLAN-Revised_100920.pdf (11/5/2020)
  • Elliott Place_Electrical ComCheck_100920.pdf (11/5/2020)
  • Elliott Place_Mechanical ComCheck_100920.pdf (11/5/2020)
  • Elliott Place-Shearwall Corrections .msg (9/7/2022)
  • Elliott Place-Shearwall Corrections, 132, 139.pdf (9/7/2022)
  • RB70 RB69 REPAIR 21353-20220421084502.pdf (9/15/2022)
  • RD99 RD100 REPAIRS 21352-20220421143131.pdf (9/15/2022)
  • RE Fargo - Elliott Place project.msg (2/2/2022)
  • 03 20 00 - Concrete Reinforement - Shop Drawings - For Record Only.pdf (8/19/2021)
  • 03 20 00 - Concrete Reinforement - Shop Drawings_EOR.pdf (8/19/2021)
About This Site

This site allows you to search permit data on-line. You may also create an account to submit permit applications, track the progress, and make payments.

Need help?

We’ve created a webpage that explains each permit or registration step-by-step and gives you detailed information about fees, required forms and related items.

Online Help >
Report a Problem

Trouble with your application or inspection request? Give us a call! 701.241.1561